Alternate route advisory: Road work and closures for this weekend

Kingsley: Monday, March 26 – Friday, March 30, 2018. Beginning Monday March 26, work will begin on Kingsley Street between Fourth and Fifth avenues 7 a.m.-5 p.m. for construction loading.

Traffic will be maintained in both directions with the use of flaggers.​* Pedestrian through-traffic will be maintained on one side of the street at all times. Pedestrian access into businesses will be maintained.​ Work should conclude by 5 p.m. on Friday, March 30. ​

Northbound curb lane at State and Hoover: Feb., 1, 2018 – TBA. Beginning on Thursday, Feb. 1, 2018, the northbound curb lane of State, just before the intersection with Hoover, will be closed to vehicle traffic. A broken traffic signal pole had been discovered and needs to be replaced, therefore a temporary traffic signal will be occupying the vehicle lane until a replacement pole arrives.

On Saturday, March 24, 2018 from 11 a.m. to 2 p.m., the following streets will be closed to traffic for the March for Our ​Lives special event (PDF):

  • ​South side of Stadium Blvd between Main and Seventh
  • East side of Seventh between Stadium Blvd and the Pioneer High School property line.

 

Tags from the story
More from Special to Discover Communities

A2 Farmers Market to host first Community Supported Agriculture Day April 21

​What is a CSA, and which is right for you? Those who...
Read More

Leave a Reply

Your email address will not be published. Required fields are marked *